Frontier-Kemper-Tutor Perini Joint Venture Awarded $1.18 Billion Manhattan Tunnel Project

Frontier-Kemper-Tutor Perini Joint Venture Awarded $1.18 Billion Manhattan Tunnel Project

◼ $1.18 billion contract awarded for the Manhattan Tunnel Project
◼ Part of the Hudson Tunnel Project (HTP) to improve resiliency and reliability of New York-New Jersey rail tracks
◼ Design-build contract for twin 30-foot diameter tunnels beneath the Hudson River

A joint venture between Tutor Perini and its subsidiary Frontier-Kemper Constructors has been awarded the contract for the Manhattan Tunnel Project, part of the Hudson Tunnel Project (HTP). This project aims to create two new passenger rail tracks between New York and New Jersey and rehabilitate the aging North River Tunnel damaged by Superstorm Sandy.

The project includes:

  • Design and construction of twin 30-foot diameter tunnels
  • 700-foot length beneath the eastern shore of the Hudson River
  • Access shaft at 12th Avenue and Manhattan West Side Highway

Work is expected to begin in spring 2025 with substantial completion by 2029. This project will be added to Tutor Perini’s backlog in Q1 2025.

About Tutor Perini Corporation
Tutor Perini is a leading civil and specialty construction company providing services to private and public sectors worldwide since 1894. The company is known for executing large, complex projects on time and within budget.

Latest from Blog

What to Check Before Building Systems Are Concealed

What to Check Before Building Systems Are Concealed

What Should Construction Teams Check Before Building Systems Are Concealed? Before building systems are concealed, construction teams should verify that required inspections are complete, installed MEP components meet project requirements, and future
New Holland Construction New Machines for Versatility

New Holland Construction New Machines for Versatility

New Holland Construction Launches Five New Machines for Material Handling and Landscaping New Holland Construction has introduced five new machines across its mini track loader, rough terrain forklift and compact wheel loader
Tadano ATF 100 G-4 Wacken Festival Overview

Tadano ATF 100 G-4 Wacken Festival Overview

Tadano ATF 100 G-4 Lifts Iconic Bullhead Onto Wacken Festival Stage Kranverleih Wilhelm has used a Tadano ATF 100 G-4 mobile crane to lift the iconic Bullhead onto the main stage structure
Potain ECS Tower Crane Control System Features

Potain ECS Tower Crane Control System Features

Manitowoc Introduces Potain ECS Smart Tower Crane Control System for Emerging Markets Manitowoc has introduced the Potain ECS tower crane control system, a new platform designed to improve crane operation, monitoring and