STRABAG gets railway hub ready for the future: 268-million-euro infrastructure contract in Poland

STRABAG gets railway hub ready for the future: 268-million-euro infrastructure contract in Poland

  • Investment in modern infrastructure around Maksymilianowo station boosts freight and passenger transport
  • Design and Build: 38 kilometers of track renewal, new bridges and higher speeds for rail traffic

STRABAG Sp. z o.o., the Polish subsidiary of STRABAG, has signed a contract with Poland’s national railway operator PKP for the planning and execution of extensive construction works at Maksymilianowo railway station. The 268-million-euro project is part of the strategic modernisation of rail line 201 between Maksymilianowo and Kościerzyna, which is important for the Baltic-Adriatic Corridor and the trans-European TEN-T network. The construction period is 51 months, with completion scheduled for December 2029.
 
Maksymilianowo station is a strategically important rail hub in the Kuyavian-Pomeranian Voivodeship, where freight lines 201 and 131 intersect. In future, this will be made much safer by a complex railway flyover. The extensive modernisation of the entire station area will also significantly increase line capacity, facilitate freight transport to the port of Gdynia and promote the region’s economic and tourist development.

The project includes, among other things:

  • around 38 kilometers of track reconstruction,
  • three platform modernisations including a barrier-free access tunnel with lifts,
  • four railway bridges, one road bridge and one road viaduct,
  • a railway flyover
  • new signal control system,
  • the catenary network, including new support structures.

“Poland has become one of STRABAG’s most important markets
alongside Germany and Austria, particularly in infrastructure
construction. The modernisation of Maksymilianowo station adds to a
series of railway projects in which we have demonstrated our
expertise – for example, for the Kraków agglomeration railway, the
Poznań–Szcecin line and, currently, the Żywiec–Sucha Beskidzkasection,” says Péter Glöckler, Member of the Management Board for
STRABAG SE’s South + East segment.
Once completed, the upgraded lines in Maksymilianowo will allow
freight trains to travel at speeds of up to 120 km/h, and passenger
trains at up to 160 km/h (line 201) and 200 km/h (line 131). The
project is seeking funding from European Fund for Infrastructure,
Climate and Environment (2021–2027), which is co-financed by the
EU.
With decades of experience in rail infrastructure, STRABAG is one of
Europe’s leading companies when it comes to the planning,
construction and modernisation of railway lines. An extensive fleet of
large-scale railway track construction equipment enables the efficient
delivery of complex projects. In STRABAG’s core markets in Eastern
Europe, rail construction is gaining importance, supported by national
and EU investments. STRABAG is currently implementing major rail
projects in Czechia, Poland, Germany, and Croatia.

Latest from Blog

Asset Intelligence for Building Operations Explained

Asset Intelligence for Building Operations Explained

Glider and Virtual Helpdesk Partner to Bring Asset Intelligence to Building Operations Glider Technology Limited (Glider) and Virtual Helpdesk Limited (VHD) have announced a strategic partnership to help asset owners maintain accurate,
ACCIONA Sanitation Contract in Brazil Overview

ACCIONA Sanitation Contract in Brazil Overview

ACCIONA has signed a public-private partnership (PPP) contract with the Paraíba Water and Sewerage Company (Cagepa) to provide sanitary sewerage services across 85 municipalities in Paraíba, Brazil. The 25-year project will expand
Liebherr MK 88-4.1 Mobile Construction Crane Features

Liebherr MK 88-4.1 Mobile Construction Crane Features

Liebherr MK 88-4.1 Crane Supports Art Restoration on Paris’ Pont-Neuf A Liebherr MK 88-4.1 mobile construction crane from the Ponticelli group supported repairs to JR’s monumental art installation, ‘La Caverne du Pont-Neuf,’
I-285 Corridor Transportation Improvements Explained

I-285 Corridor Transportation Improvements Explained

Jacobs to Support Transportation Improvements Along Atlanta’s I-285 Corridor Jacobs will provide construction engineering and inspection services for transportation improvements along Atlanta’s I-285 corridor. The work will support roadway, bridge and safety
Freshwater-Free Concrete Initiative and Its Impact

Freshwater-Free Concrete Initiative and Its Impact

Fortune Recognizes Cemex for Freshwater-Free Concrete Initiative in Mexico Cemex has been included in Fortune’s 2026 Change the World list for its freshwater-free concrete initiative in Mexico. The program replaces freshwater used
Oak Hill Parkway Project Enhances Austin Mobility

Oak Hill Parkway Project Enhances Austin Mobility

Fluor Joint Venture Celebrates Opening of Oak Hill Parkway in Austin, Texas The $677 million project improves mobility, safety and connectivity along a major transportation corridor in southwest Austin. Fluor Corporation and